Tuesday, November 29, 2011

How to Make a Driveway

Building a driveway requires some knowledge of basic earth work along with being able to produce elevations along the driveway's center line, drainage, site clearing, potential rock discharge and placement and compaction of the driveway face material. Development a small clearing to park a car may be nothing more removing a few saplings but construction a new driveway to a home or construction can be a major task.

In many areas a driveway permit is required from the jurisdiction that owns the main road. County Road, County permit, State Road, State permit and so on. An application must completed and submitted along with a drawing showing the proposed driveway location, entrance construction methods as well as a check for a carrying out bond to assure no damage is done to the municipal roadway while the driveway is being built. Once the driveway is completed, a highway inspector will check the new work and return the carrying out bond if no damage was incurred.

DRYWALL SETTLEMENT

It is very coarse today to have a culvert pipe installed under the driveway to divert storm water under the driveway into a roadside drainage ditch rather than over the top of driveway thereby washing away the driveway materials and washing soils,gravel stone, etc. On to the main roadway. A pipe material designated as type Hdpe (black plastic with corrugations) is the most commonly used pipe today. It has a long life span as it does not rust and is very strong as well. Buried only a few inches below well compacted earth or possibly item 4 stone, the pipe will allow a tandem dump truck to easily pass over without crushing the pipe.

Once the driveway location is set, the drainage culvert is set in place with a little downward tip to help water scour the inside of the pipe clear of debris with rain water washing. Driveways are regularly at least ten feet wide but the beginning or "mouth" of the drive may be twice that. This allows for easier turning in and out of the driveway on an angle. Otherwise you would have to make a sharp right angle turn each time. Not an easy driving maneuver. Soils or stone being settled around and over the pipe must be installed in shallow layers. The use of a vibratory compactor is roughly mandatory if the driveway is to be used right away. If a long time period will elapse (months or years) natural settlement of the material may suffice but is not recommended. Many municipalities need the first section of the driveway to be paved with asphalt. Twenty to Twenty-Five feet is coarse with the entire mouth of the drive included. This prevents car tires from spinning gravel and rocks on to the main roadway face and if struck by other cars or a snow plow, can come to be airborne hazards.

With the entrance completed, the clearing and discharge of trees or stumps, large rocks and other site items can begin. Being able to use a transit and rod to set final grade elevations for the center line of the driveway is a big help. A surveyor can of course set what are called grade stakes for you to ensue as you produce your road bed. You see them often at road work sites with red or orange plastic tape hanging from them. That is how the road workers know where and how high to place the soils for the roadbed. House driveways commonly are constructed with a bulldozer and possibly some type of backhoe or excavator. When special conditions arise such as rock outcrops that are in the way, dynamite or special rock hammers may be required. These are for the pros alone to handle.

Once the base of the driveway has been cleared it may need some drainage piping under the driveway to allow rain runoff to pass harmlessly under the driveway to a lower elevation. Mountain streams,brooks and wet weather run offs all have to be handled to prevent storm water runoff from destroying the driveway with each rainfall. Constructed properly in the definite locations, these drains will last for many, many years.

The last item is the driveway topping. Driveways are not regularly asphalt paved within the first few years to allow the road bed to wholly decide into place. The same of paver stones, concrete or other attractive face materials. A six inch thick layer of a stone material known as Dot Item 4 settled on top of the bare earth and then compacted with a heavy duty roller will last for a good long time while providing a great driveway. Over time as the ground settles, small amounts of Item 4 may be added to articulate a level and flat condition. Only once all settlement has stopped, and it is thought about that all the drainage piping is working correctly, should a final driveway topping of your selection be applied.

Pete

Your kindly construction Inspector

How to Make a Driveway

DRYWALL SETTLEMENT

Tuesday, August 23, 2011

How to Build a Cheap Guardrail for Your Driveway

Many driveways have an area that require some type of protection guard rail to prevent vehicles from sliding off the driveway in inclement weather or maybe just a driver error. Metal guard rails can be quite high-priced and require a pounder (Sterling) truck to set the guardrail posts. With some sweat and a lot of exertion you can establish a guardrail for approximately no money. Power and telephone companies continually replace their poles on a quarterly basis. This may be naturally an upgrade to a pole to carry new transformers or to raise a section of wires for vehicle traffic and so on.

These companies need to pay to have these old poles disposed of and that's where you step in. Sense your local power or telephone firm and ask where they store the damaged or old poles and tell them you would like to have a few. They will in approximately all cases be glad to get rid of them. It saves them money. You of course cannot carry full sized poles so you will need a chain saw with some old worn chains to cut the poles into manageable six foot long sections. Please notice I said old worn chains for your saw. Grind them before you cut but be ready to discard them when your done cutting the poles. Power poles are regularly full of private nails from your neighbors posting their carport sale signs but are also littered with screws, pins and all kinds of metallic items. Each and every metal piece is death to a chain saw chain. You can or course visually scan for these items before you cut but the concealed ones are the problem. Make sure you wear heavy work gloves when handling these poles as there will be splinters galore and any sharp objects will tend not to cut or stab you as easily. Be meticulous while you work and all the time wear eye and ear protection well.

DRYWALL SETTLEMENT

A guardrail will need a post every six or eight feet and of course at any point where the guardrail turns a corner. A right twenty four foot guardrail with post at six foot centers would need five posts. Also a reminder that power poles are coated with creosote so wear old clothes when handling them. You will also need the longest pieces you can handle for a top rail. A top rail will furnish much better protection but just plain posts close adequate together can also furnish very good protection. With all the pole and rail pieces now at home, lay out the centers of each post. Remember to portion from the starting edge of the first post and not the town line. Intermediate posts are measured to town line and the last post is the far edge away from the first post.

Here's where you need to rule if you want to dig the holes for the poles yourself or hire man with a auger truck to do it for you. Your labor is free but very time consuming, the auger truck is quick and easy but costs some cash. If your short on time or help, the auger truck may be a good investment. With the holes dug, set your starting post. Once in the correct position check to assure the post sticks a minimum of two feet above closed grade. Back fill the post tamping the material in place as you go. Now move on to the rest of the posts making sure each one is on the proper town line and height.

A good trick here is if your guardrail is in a right line, set the first and last posts first. Place a nail in the town of these two posts and string a line in the middle of them. You now have a quick guide to both town lines and heights of all the intermediate posts without having to portion each one. Once all the posts are in place let them sit for a few days and hopefully some rainfall will come to supplementary rule the soil around the posts. If you have a water source close by, a good soaking of the back fill soils will railroad the settlement process along nicely. Cleanup around your posts removing all rocks and excess spoils and perhaps toss down some grass seed to restore the area. It is much easier to do this before the top rail is placed. Raking under the rail and climbing back and forth over it wears out actually quickly.

Once ready for your top rail, place the top rail alongside the posts on the ground with one end over hanging the first post a few inches. Mark the top tail for both sides of the all the post locations. Once marked, you must considered notch out a two inch deep slot to receive the post top once the rail is set on top of the posts. Try to be as neat as you can but you are cutting with chainsaw. A half inch wider notch is no big deal. Place the cut top rail onto the posts. I use sixty penny galvanized landscaping spikes to fasten the to rail to the posts. You may want to pre-drill the holes in the top rail and you will need at least a five pound lump hammer. Two spikes in each post should be sufficient. Once all the rail is in place you can either naturally let it weather naturally or add a new coat of stain or sealant.

How to Build a Cheap Guardrail for Your Driveway

DRYWALL SETTLEMENT